GEARED TO GIVE YOU A FLYING START
IN SYNERGY WITH YOUR MOMENTUM FOR SUCCESS
New B2
Industrial
Facility
Units In Total
Ramp-Up Levels
Ground Floor Units With Mezzanine & Prominent Frontage
Ancillary Canteen
Payment order status is abnormal
-
12,800
186
10
15
1
19
01
Direct car / lorry parking at your doorstep
06
Ready pool of customers and workforce from 05 residential estates
PRACTICALITY
05
CATCHMENT
6BUSINESS THRUSTERS
02
Prime address at the doorstep of Jurong Lake District
LOCATION
03
ACCESSIBILITY
Easy access from Jalan Ahmad Ibrahim and Corporation Drive via AYE
04
EFFICIENCY
Wide driveway
BUILT FOR
A SEAMLESS EXPERIENCE
Speed, agility and pace of innovation are the new pivots of success. REVV has been designed to promote smooth workflow and movement anywhere within the development.
• Smooth vehicular access to and from units
• Abundance of natural light and wide spaces facilitate ease in circulation
• Green spaces connect occupants to pockets of revitalising areas
IN POLE POSITION
Put your business at the doorstep of the upcoming Jurong Lake District, Singapore’s 2nd CBD. It will be the largest commercial and regional centre outside the city core, comprising of the Jurong Gateway mixed-use business district and the Jurong Lakeside leisure district, home to the future Jurong Lake Gardens.
• New residences, attractive street life, and a rich network of leisure options
• Future 7-ha integrated tourist hub with a hotel, large-scale entertainment spaces, eateries and shops adjacent to Chinese Garden MRT station
• Strategically located near the future Tuas Port and two world-class research universities
• Close proximity to International Business Park
• Easy access to major parts of Singapore via West Coast Highway, AYE and PIE
Taman Jurong Market
Jurong Superbowl
AYE
Lakeside MRT Station
JEM Jurong Gateway
HIGH SPECIFICATIONS
FACTORY UNITS
• Located at Levels 1 -10
• Units with Mezzanine at Level 1
• Open Roof Concept at Level 10
• High Floor-to-Ceiling Heights
• Prominent Street Frontage
• Flexible Workspaces, All Levels
• Full Glass Façade
​
​
• Ancillary Canteen at Level 1
• End-of-trip Facilities with Secured Bicycle Parking
• Shower Facilities at Level 1
• Toilet in n Every Unit
PROVISIONS
LAYOUT
• Efficient Space Planning
• Wide Driveway up to 9.6m
• 1 Service & 3 Passenger Lifts
• Wide Roller Shutter
One-stop, multi-use B2 facility with ramp-up access to all units
INFRASTRUCTURE